Volume 7, Issue 4 (Journal of Control, V.7, N.4 Winter 2014)                   JoC 2014, 7(4): 19-29 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Salahshoor K, Hoorfar F, Abbasinejad R, Ataei S S. Design and Implementation of a Risk Based Maintenance Program for Determining Optimum Maintenance Intervals for Field Instruments in Sarkhun Gas Refinery. JoC 2014; 7 (4) :19-29
URL: http://joc.kntu.ac.ir/article-1-208-en.html
Abstract:   (7763 Views)
The main goal of performing a maintenance program is increasing of the benefit and process reliability without any negative effect on personnel safety and environmental concerns. Risk based maintenance road map reduces fault occurrence probability and as a result reduces effects of equipment failure happening (economical, environmental effects). This type of risk based planning helps much in making right and economic decision making. This paper introduces risk based maintenance plan for selected instruments in Sarkhun and Qeshm gas threatening company. By designing of an adaptive preventive maintenance strategy as an inspection program and obtaining an optimum checking interval devices risk will be reduced.
Full-Text [PDF 1114 kb]   (2180 Downloads)    
Type of Article: Research paper | Subject: Special
Received: 2015/02/26 | Accepted: 2015/02/26 | Published: 2015/02/26

Add your comments about this article : Your username or Email:
CAPTCHA

Send email to the article author


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Control

Designed & Developed by : Yektaweb